The project was for the design of a new mezzanine floor to cover approximately 70% of the available floor space. This was complete with access staircase and intermediate stairs to give access to the existing first floor offices directly from the mezzanine floor.
30 Jan 2017
The continuous expansion of our customer’s base and the new product lines added created the need for expanding their existing warehouse. Romstor offered an efficient solution installing a pallet racking scheme designed to be capable of storing peak stock levels with warehouse space available for future increase in stock levels.
22 Nov 2016