Home > Steel Line Ltd > PROJECT CAMPFIRE, MACAU, SOUTH EAST ASIA

PROJECT CAMPFIRE, MACAU, SOUTH EAST ASIA

Steel Line Ltd News and PR from Steel Line Ltd - Published 12 September 2019 In May, we supplied a stainless steel slide with an overall width of 2.45M for installation in a park based in the territory of Macau.
The slide measures 4M long and includes a satin polish finish.

In addition to the slide, we fabricated two tubes which are installed underground for children to crawl through. The tubes are both 5M long with a diameter of 850mm, which allows for parents to crawl alongside their children through the tunnels if so desired.
In addition to the slide, we fabricated two tubes which are installed underground for children to crawl through

Other announcements from Steel Line Ltd