Home > RMIG Ltd > Case study - MSCP Time Square, Bridge Street

Case study - MSCP Time Square, Bridge Street

RMIG Ltd News and PR from RMIG Ltd - Published 02 August 2019 A facade of perforated sheets used for a state-of-the-art facility
MSCP Time Square, Bridge Street
Multi-storey car park, Warrington, England
Architects: Leach Rhodes Walker

A facade of perforated sheets used for a state-of-the-art facility.

As part of the redevelopment of Bridge Street in Warrington, Cheshire, a multi-storey car park has been constructed, providing the town with more than 1,000 much-needed parking spaces. This massive eight-storey car park has a remarkable facade made from an astonishing 3,500 m2 of perforated sheets manufactured and supplied by RMIG, with RMIG ImagePerf technology being used to create the vivid perforated patterns.

Technical characteristics:

- Raw material: Aluminium EN 1050 and Aluminium J57S
- Pattern: RMIG ImagePerf
- Thickness: 3.0 mm
- Finishing operations: Folding
- Surface treatment: Powder coating and anodising
This massive eight-storey car park has a remarkable facade made from an astonishing 3,500 m2 of perforated sheets

Other announcements from RMIG Ltd