Home > Zaun Ltd > Original temporary electric fence now deploys even faster

Original temporary electric fence now deploys even faster

Zaun Ltd News and PR from Zaun Ltd - Published 11 December 2018 The original anti-vehicle rapid-deploy temporary electric fence system – first used in tandem on the London 2012 Olympics – is now even quicker and easier to roll out.
Three leading names in perimeter security have collaborated to incorporate the new temporary electric fence technology into the established SecureGuard HVM rapid-deploy barrier fencing system.

Electric and electronic fencing expert Harper Chalice Group Limited has developed RapidPulse, a pre-configured ‘start’ and ‘stop’ to each pulse-monitored ‘zone’, to allow rapid deployment of its PulseSecure system.

Steel fencing manufacturer Zaun Limited has created special pairs of posts for the anchor point fencing panels, with crossed bracing bars to bear the load of the electric cabling.

The system can be supplied with any of Zaun’s existing fencing panels – including HiSec, HiSec Super 6 or ArmaWeave – all deployed super-fast with no foundations on top of SecureGuard HVM barriers from Highway Care Security.

Trial installations have seen Harper Chalice, Highway Care Security and Zaun deploy 30m of HVM barriers and fencing with perimeter intrusion detection in just one hour.

“This is set to revolutionise the market for temporary high security utilities, roadworks and construction compounds without the need for any civil or ground works,” says Zaun sales and marketing director Chris Plimley.

The partners first proved the concept at the London 2012 Games, at which they secured various sections of the Olympic Park perimeter with temporary HVM barriers and fencing combined with PulseSecure.

The RapidPulse innovation now makes it possible to install perimeters temporarily, break them down, then redeploy them in a fraction of the time, making secure but mobile compounds a reality as works progress during a project.

Harper Chalice MD Chris Hackett says: “The overall system provides a psychological barrier as well as a physical deterrent.

“And it offers a fantastic solution for ongoing security when a breach in a permanent perimeter is required temporarily for repair, maintenance or upgrade, without reducing the overall protection of the site.”

The system is fully compliant with BS 1722 Part 14 and Part 17 and can be supplied either galvanised or polyester powder-coated with all components manufactured in the UK.

Each post and panel can also be supplied up to 3.5 metres total in height, while pedestrian and vehicle gates can also be incorporated, as can CCTVcolumns, turnstiles and access portals.

The system is ideal for using around high security temporary utilities and construction sites, to protect road works or at major events that might be at risk of protests, riots or terrorist activity.

SecureGuard with RapidPulse provides protection against vehicle attack, pedestrian intrusion and rock fall and debris dispersion.

The barrier is available to rent or to buy.

SecureGuard was developed specifically for the G8 Summit in Northern Ireland and has since been deployed at the Glasgow Commonwealth Games, the NATO Conference in South Wales and the Nuclear Security Summit in The Hague.

It forms part of the National Barrier Asset.
This will revolutionise temporary high security utilities, roadworks and construction compounds without civil or ground works

Other announcements from Zaun Ltd