The project comprised:
1. 45m3 Pellet Reception hopper discharging 27 Tonnes in 2 hours
2. 31m long pocket belt elevator at 22m3/hr
3. 2.5m primary transfer screw conveyor at 22m3/hr
4. 6m fuel silo distribution screw conveyor at 22m3/hr
5. Two x 175m3 fuel storage silos
6. Two x twin 5.2m silo discharge screws at 18tph
7. 21m long primary 650mm wide belt conveyor
8. 6m distribution screw
9. One x 500mm wide 15m long bottom ash drag scraper conveyor
10. 8m long fly ash primary screw conveyor
11. 6m long fly ash secondary screw conveyor
12. Access steelwork & Walkways
13. Electrical control package MCC & PLC
14. Installation
15. Commissioning