Welcome to
Estitect Technical Services,
the essential qualification of any Company in the current market
climate is the ability to act quickly on sales leads & the
inevitable measuring of costs that make up the final estimate,
enabling the Company to win those precious contracts.
Estitect Technical Services was
formed in 1995 to give UK Electrical Contractors in the Construction
Industry, a complete Electrical Estimating Service that is fast,
efficient & sensibly competitive. It is often the case that in-house
estimating departments are often overloaded with work, or
alternatively, cannot find enough to do &, whichever way you look at
it, it is very often counter-productive & certainly not cost
effective.
We offer a Freelance Service that is both Professional & Personal
which is second to none. Existing Clients are from Northern Ireland,
Southern Ireland & UK Mainland. We offer a confidential service, all
Estimates will be prepared on Our Computerised Estimating System, &
will be returned back to Your Offices, allowing for any further
discussion before submission of the Tender.

Material Discounts &
Labour Rates can be set as standard or tailored to your own.
A PDF report will be produced to include full estimate details with
Summary & Material Schedules. A Schedule of Rates will be produced
as the estimate is compiled, although any alterations or special
requirements for this would be subject to an extra charge. Any
documents received for the same contract from other companies will
be treated with "first come, first served" rule & those documents
returned.
Our service consists
of taking information from Clients drawings or bills of quantities &
setting out in sections as required in the Tender Summary, giving
quantities, details, material costs, unit time in hours & totals. |
|
The
Estimate will be prepared using Our Computerised Estimating System.
Estimate Takeoff Sheets will comprise details of various items as
they are taken off Your Drawings & Specification. The Takeoff will
be broken down into various sections as required in the Summary of
Tender, i.e. Main Switchgear, Lighting Inst., Power Inst., Fire
Alarm System, Etc. |
|
Once
the various items have been taken off the Contract Documents a
report will be produced. This report known as the Estimate Detail
will detail the Item Description, Trade Price, Quantity, Trade
Discount, Nett Material Cost, Material Markup, Material Sell, Labour
Unit Hours, Total Hours, Labour Rate, & Labour Sell for each
Section. All items on the Estimate Sheets will be Laboured
individually using Man Hour Metric Rates. Any Confirmation
Quotations required in connection with the bid, will be requested &
addressed to your Company Offices. |